Teleconference 2019-01-30

From VTKM
Revision as of 12:35, 30 January 2019 by Kmorel (talk | contribs) (Created page with "Attendees: ==ECP updates== * No more monthly updates (just quarterly updates) ** Will go over more during these telecons to keep up to date ** Need occasional highlights ***...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attendees:

ECP updates

  • No more monthly updates (just quarterly updates)
    • Will go over more during these telecons to keep up to date
    • Need occasional highlights
      • Dave: comparison of streamlines to hard-coded algorithm
  • Prep for FY20 and beyond
    • Friday we will receive our budget for FY20
      • We were told it will be the same as FY19 and flat-lined through FY23
      • The number we will be given will be for whole project. Expect to keep same division of funding.
      • In practice this is a small year-to-year reduction
      • We should move forward in moving UO's contract to ORNL
    • We will also receive a template for a ~3 page "proposal" for what we plan to do
      • General description of what the project will do and provide
      • A very high level description of milestones
      • Due February 15, but for practical reasons we need it done next week. We will move fast. Reserve time to help respond.

ECP deliverable updates

FY19Q2

  • [MS-19/04] Ghost Cells
    • Dave added a filter that removes ghost cells
    • Just made a filter that adds a ghost layer array to structured grids (to mark external areas as ghost).
    • It was suggested that for completion of the milestone, the histogram filter should be modified to optionally accept a ghost cell array to ignore inputs from ghost cells.
  • [MS-19/05] Merge Points
    • Ken is on the hook for merging the Merge Points worklet in.
    • The functionality will actually be part of clean grid.
  • [MS-19/06] Connected Components
    • No one from LANL is here.
  • [MS-19/07] Advect Time Varying
    • The components are generally there.
    • Need to write some tests (currently there are only examples)

FY19Q3

  • [MS-19/08] Point Movement 2

FY19Q4

  • [MS-19/09] Path Geometry
    • Dave P.
  • [MS-20/01] Lightweight Cell Library
  • [MS-20/02] Specialized Data Models
  • [MS-20/03] Feature-Sensitive Surface Norm
  • [MS-20/04] VTK-m Release 3
  • [MS-20/05] Cell Metrics
  • [MS-20/06] Contouring
  • [MS-20/07] Advanced Flow Algorithms

Rountable notes