Teleconference 2019-03-13
Jump to navigation
Jump to search
Attendees:
ECP Updates
- P6 Activities due by the end of this week. Have a meeting on this immediately following.
ECP deliverable updates
FY19Q2
- [MS-19/04] Ghost Cells
- Merge request in for ghost cell removal how Matt needs them.
- Some issues with the ghost array being UInt8.
- Probably should add UInt8 to common types, at least in the short term.
- In the long term, we need a way to support a slow path for "unknown" types.
- Ghost cell filter for structured cells has been merged in.
- [MS-19/05] Merge Points
- Ken has an implementation in a merge request.
- Working through CUDA compile error.
- [MS-19/06] Connected Components
- Expecting to have an MR either end of this week or beginning of next.
- [MS-19/07] Advect Time Varying
- Still having some issues with grid evaluators.
- Rob will look into it.
- Still having some issues with grid evaluators.
FY19Q3
Skipping
FY19Q4
Skipping